After some evenings in the garage I am shure, that I have done every job on the chassis and the body, which have to be done before they were joined together.
- remove the handbreak
- remove the pedals
- remove the rear trailing arms with the anti bump stear kit
- seal the holes for the cavity sealing in the frame
- tighten up all the break lines - hopefully they do not leak...
- fix self adhensive rubber strips on all areas where frame and body will touch each other
- drill a second hole in the trunk for the gas return pipe
- clean up everything
OK, asking some neighours for help and in about 20 minutes it was back:
Now lets start to assemble all the parts step by step...
No comments:
Post a Comment